Repository of documents

Here you can directly review, comment or download all outputs of the project Activity 2.3 (Side documents are not developed under this activity but are clearly marked and provided as reference):

Note: When making comments/notes online to the documents please indicate your email adress at the biggining of the first comment

date Final Drafts: Flood Risk Management Plan and the Strategy for the Drin Basin Documents open/download for comments/review untill
05.11.2024 Transboundary Flood Risk Management Plan for the Drin River Basin 2025 - 2031 Review & Download 20.11.2024
05.11.2024 Annex I - Macro Areas Drin Basin Open 20.11.2024
05.11.20234
Annex I.a Macro areas - Lower Drin
Open 20.11.2024
05.11.20234
Annex I.b Macro areas - Upper Skadar
Open 20.11.2024
05.11.20234
Annex I.c Macro areas - Middle Central and Black Drin
Open 20.11.2024
05.11.20234
Annex I.d Macro areas - Upper Lakes Ohrid and Prespa
Open 20.11.2024
05.11.20234
Annex I.e Macro areas - White Drin
Open 20.11.2024
05.11.2024 Annex II - Harmonized catalogue of the transboundary FRM Measures Open 20.11.2024
05.11.2024 Annex III - Scores Optioneering Analyses Open 20.11.2024
05.11.2024 Draft Flood Risk Management Strategy for the Drin Basin 2025 - 2031 Review & Download 20.11.2024
05.11.2024 Annex III - Transboundary APSFRs (Albania - Montenegro) Open 20.11.2024
05.11.2024 Annex IV - Transboundary APSFRs (North Macedonia - Albania) Open 20.11.2024
05.11.2024 Annex V- Transboundary APSFRs Kosovo * Open 20.11.2024
date Previously reviewed documents in the EWG for the floods cosultation process version for comments/review
16.09.2024 D5:Flood Risk Management Strategy for the Drin Basin Review & Download Final Draft completed
25.09.2024 D7:Flood Risk Management Plan for the Drin Basin Review & Download Final Draft completed
09.10.2023 D3:The Road Map Review & Download Draft completed
09.10.2023 D3: Annex II - Road Map Time Schedule Review & Download Final Draft completed
09.10.2023 D2: Background report on status of the FRM in the Frin basin Review & Download Final Draft completed
09.10.2023 D3 :Annex III - List of APSFRs_DM Review & Download Early draft completed
09.10.2023 D9 :Draft Plan on public consultation activities for FRMS and FRMP Review & Download final version completed
09.10.2023 D1: Draft background on the status of the FRM in the Drin basin Review & Download Final Draft completed
date Side document name version for comments/review
10.09.2024 Side document: Cimate change resilient sectoral FRM policy on agriculture in the Drin Basin Review & Download Final Draft completed
10.09.2024 Side document: Climate change resilient sectoral FRM policy on hydropower in the Drin Basin Review & Download Final Draft completed
05.01.2024 Side document:Annex II of the Sectoral studies for Agriculture: Technical study on climate change impacts on Agriculture in the flood prone areas of the Drin River basinReview & Download Final Draft completed
05.01.2024 Side document:Annex II of the Sectoral studies for Energy: Technical study on climate change impacts on Energy in the flood prone areas of the Drin River basinReview & Download Final Draft completed
10.09.2024 Side document: Background report on the flood risk transfer mechanisms in the Drin Basin Review & Download Final Draft completed